×

About

Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum. Sed ut perspiciatis unde.

Newsletter

Hot Dip Galvanization Pre-treatment Tanks

Hot Dip Galvanization Pre-treatment Tanks

It is possible to install manually controlled systems in all cabinet and hanger bathrooms, and the necessary automation (such as elevator system in cabinet bathrooms) can be added to provide convenience in manufacturing.

  • Engineering and Project Design
  • Engineering and Project Design
  • Supply of Equipment
  • Industrial Long Life Tank Design (2.0 safety coefficient in accordance with DVS 2205)
  • Ventilation Services
  • SCRUBBER Design and Production for Acid Tanks
  • Long Term Service Period

Prometal Galvano, for every surface in life

  • +90 (212) 549 9 549

  • info@prometalgalvano.com

  • İkitelli O.S.B. Mahallesi Milas Caddesi Dış Kapı
    No:13/A İç Kapı No:Z01 Başakşehir / İstanbul

  • Mon-Fri: 08:00 - 18:00